auf Kompressorausrüstung.: ausschreibungen, öffentliche beschaffung 2024




Bitte registrieren Sie sich

Teilen Sie dies:
insgesamt: 270
18 apr

Nummer: 103033956

Land: United States

Quelle: RFQ

13 apr
Air Compressor Test Equipment (EN) Zu Favoriten hinzufügen
Ende der Bewerbung durch: 73 Tage
Kunde: Made-in-china

Nummer: 102808763

Land: Nigeria

Quelle: Made-in-china

11 apr

Nummer: 102614825

Land: Colombia

Quelle: RFQ

09 apr
Quotations are hereby invited for the following: Major service and 36-month statutory inspection of Boiler 2 (John Thompson coal-fired steam boiler) as well as ancillary equipment neglected in the boiler house: Specifications: • Strip the boiler as required for external and internal inspection, • Chemical clean of water side (acid wash), • HP cleaning of tubes, as required, • Sand blasting of tubes & shell, as required, • Service/repair of stoker mat and stoker drive, • Service of all valves, including test certificates for safety valves, • Calibration of pressure gauges, • Refurbishment of gauge glass assembly, cocks, and Mabrey level controls, • Refurbish the FD fan, and ID fan (replace all belts and bearings), • Replacement of guillotine door, and cables, • Replace ignition arch, side seals, etc, • Rebuild the ash wall, • Refurbish 2 x Grundfos feed pumps, • Clean out the electrical panel, • Prepare the boiler for 3-year statutory inspection, • Provide a certified AIA inspection authority to conduct a complete statutory inspection, including pressure test in accordance with the PER 36-month inspection requirements, • Reassemble the boiler, including all new gaskets, lagging and stainless-steel cladding, and refractory brickwork, • Re-commission the boiler and test all safety functions, • Provide a hardcopy inspection book including all test certificates, service records, and certificate of continuance, • Compressor hire must be provided by the contractor, as there is no compressed air supply available in the boiler house, • Any scaffold hire, scaffold erection & inspection must be provided by the contractor, • Replace grit collector, • Replace ash trolley for grit collector, • Replace impellor on ID fan, • Install a Shut of valve on main steam line to factory, • Replace condensate line and replace condensate pumps, from EA to hot well, • Install meter at discharge on hot well, • Overhaul suit blower for boiler no 1 & 2, • Provide project plan and time frame. A standard Safety File must be submitted in hardcopy prior to any work commencing on site. (EN) Zu Favoriten hinzufügen
Kunde: ONLINE TENDERS

Nummer: 102531312

Land: South Africa

Quelle: ONLINE TENDERS

13 mar

Nummer: 101229414

Land: India

Quelle: RFQ

26 feb

Nummer: 100285639

Land: Nigeria

Quelle: RFQ

19 feb

Nummer: 99876164

Quelle: RFQ