zur Schweißarbeit: South Africa ausschreibungen, öffentliche beschaffung 2024




Bitte registrieren Sie sich

Teilen Sie dies:
insgesamt: 50
27 jun
Extension of closing date: Eskom Holdings SOC Ltd (hereinafter “Eskom”) invites you to submit a tender for the following: Collection, dismantling, assessment, repair, rewind, overhaul, assembly, painting, testing and delivery of low voltage electrical motors as and when required at Hendrina Power Station for a period of 5 years. Scope of work: Assessment will include: • Stripping the motor; • Washing all parts; • Mechanical assessment; • Electrical assessment; • Assessment report. Rewind will include: • A burn out of windings in stator; • Core test; • Painting of core with rust protection paint; • Insulation kit for winding (class H); • Manufacture of coils copper wire; • Supply leads for windings; • Varnishing the stators with Isonel 31 – Isonel no longer used replaced by Fixotropic; • Baking the varnish at 180 degrees; • Cleaning the stator core before assembly. Overhaul will include: • 2 (two) new bearings; • Balancing of rotor; • Replace broken cooling fan if needed – to be on additional part; • Replace connector block if damaged or as been requested; • Replace connection box if damaged or as been requested; • Replace end shields if damaged or as been requested; • Assembly of motor; • Electrical and mechanical testing of the motor (no load); • Painting of motor; ? Delivery back to Employer’s site. Additional work: • Micro welding; • Shaft straightening; • Machining of new feet; • Taping and replacing of bolts; • Repairing of shaft extensions; • Skimming of rotor core; • Skimming of stator feet (all 2 poles); • Repair of stator core. (EN) Zu Favoriten hinzufügen
Kunde: ONLINE TENDERS

Nummer: 106626347

Land: South Africa

Quelle: ONLINE TENDERS

13 jun
Quotations are hereby invited for the following: Supply, delivery, installation, testing and commissioning of 11 kV equipment between Pretoria and Saulsville. Specifications: Aerial Bundled Conductors (ABC): • Aerial Bundled Conductors (ABC) shall be supplied and installed under bridges. The supplied ABC shall be 12 kV rated to SABS 1339 (adapted) with a minimum cross-sectional area of 70 mm². ABC – 70 mm2 3-core (6.6/11 kV), ABC cable with PVC served galvanized steel wire catenary; • Double back guides shall be installed on both sides of the bridges - one to support the ABC and the other to support the phases. Earthing, Bonding and Surge Suppression: • Before any welding connection, the surface (s) shall be thoroughly prepared as per detailed instructions to ensure a strong and continuous bond. The galvanizing of the structures shall be removed with a grinder, and the surface where the exothermic weld is to be performed should be thoroughly cleaned; • The area where the galvanizing was removed shall be treated with zinc spraying, hot – patch soldering or coated with zinc-rich paint complying with the requirements of SABS 920; • All welded joints shall be “hammer tested” to ensure that the mechanical strength of the joints is sound. Welded joints shall also be painted; • PRASA’s Technical Officer shall inspect and approve the work before any Grading Ring is covered by soil; • Rail continuity Bonds – All joints in the rail shall be bonded with 4 x 96 mm² PVC sheeted steel cables. The continuity bonds shall be bolted to the web of the rail using the expanding collar system. The ends of the bonds shall have lugs crimped to it, which shall then be fastened to the rail using the expanding collar system; • Cross bonds – are applied between various tracks that share the return current. It consists of a 96 mm² PVC sheeted composite bond that is fastened to the web of the rail using the expanding collar system. Cross bonds shall be provided at intervals not exceeding 500 m; • Mast to rail bonds – shall exist in spacing not exceeding 350 m (5 spans). They shall consist of a 2 x 96 mm² PVC sheeted bond that is fastened with WAM Stud and Lug to the mast and fastened to the web of the rail using the expanding collar system. The end bolted to the rail shall have a lug crimped to it, which shall be fastened to the rail with a WAM stud. Where no earth wire is connected to the mast, 4 Mast to rail bonds shall be provided; • Switch Structure – shall be provided with double mast to rail bonds of 96 mm² PVC sheath steel cable; • The bridges may not be connected directly to the “traction earth wire” or to “rail” but shall be connected to rail via spark gap at 2 separate positions. Furthermore, the “dead” side of the 3kV DC insulators shall be insulated from the structure either by means of an additional disc insulator or insulating pads, bushes or washers between the insulator support bracket and the fixing bolts, the insulator support brackets then being connected to rail either directly or via a common earth wire, with two earth paths. Where only one earth cross span exists, a second shall be installed. The earth conductor protecting each set of “live” cross-spans shall be so arranged as to provide a ring connection with dual connections for every earth point; • Spark gaps to be supplied as per specification BBB1616 and installed as indicated on drawing CEE-TU-100; • A 95mm² composite cable shall be supplied and installed for all mast to rail bonds. Rail bonding fasteners shall comply with BBB6017; • Lightning arrestors compliant to specification BBB2141 shall be supplied and installed as per specification BBB2144. 44kV MOD: • Nominal system voltage: 44kV; • Rated current: 800 A; • Frequency: 50Hz; • The control panel for MOD shall be installed inside the substation; • The control panel shall have the local remote switch, closing and opening switches; • The opening and closing switch shall also be on the outside box; • All cabling for the MOD shall be the responsibility of the contractor e.g., cabling required to connect the MOD to the tele-control, trenching for the cable from the substation to the 44kV tower to carry the MOD etc; • The contractor shall supply and install jumpers (200mm² aluminium conductors) together with the clamps and all the associated works; • The MOD shall be provided with a name plate. The name plate shall be weather and rust proof. (EN) Zu Favoriten hinzufügen
Kunde: ONLINE TENDERS

Nummer: 105884334

Land: South Africa

Quelle: ONLINE TENDERS

16 may
Eskom Holdings SOC Ltd (hereinafter “Eskom”) invites you to submit a tender for the following: Inspection and repairs of ducting on units 1, 2, 4, 5 and 6 during planned outages for Duvha Power Station. The scope of modification is as follows: • Full inspection and submit report; • Grease bearings and ball joints on links; • Remove bearing stuffing box cover, clean shaft, repack & box up bearing stuffing box; • Fit new packing on all ducting inspection doors; • Replace flue gas damper doors, shafts, shaft pins, frames, divisional plates, bottom supports, 30mm square bars, 80 x 6mm seals on doors, bearings, links including mechanical settings after replacements. Doors to be collected from the stores by the contractor; • Replace all 30mm square bar sealing strips on flue gas damper; • Replace all 80 x 6mm seals on the flue gas damper doors; • Mechanical, electrical stroke checking and settings of all dampers; • Clean all debris and ash pile up within the ducting including FD fan intake screens using plastic bags; • Cut access Holes and install handrails around the holes 2500 x 1500 meters, replace after completion of internal work; • Open access doors; • Replace 6mm - 10mm thick eroded plate by welding new; • Replace 12mm - 16mm thick eroded plate by welding new; • Repair grease pipes & nipples; • Close access doors; • Vertical weld repairs on 6 - 10mm plate; • Vertical weld repairs on 12 - 16mm plate; • Horizontal weld repairs on 6 - 10mm plate; • Horizontal weld repairs on 12 - 16mm plate; • Replace bearings; • Replace 80 x 80mm angle iron Stiffeners; • Replace 100 x 50mm channels in front of doors, position of channel to be in line with 100% open door position; • Replace 100, 120, 250, 300mm x 6mm protection plates; • Replace 80Nb stays with 100 x 10mm protection (protection plate), Unit 1, 2, 4, 5 and 6 vanes: • Replace 1650 x 520 x 6mm deflector vanes and 1650 x 25 x 10mm flat bar protection (Top); • Replace 1500 x 260 x 6mm deflector vanes (middle); • Replace 1645 x 480 x 6mm deflector vanes (bottom); • Replace 1650 x 25 x 10mm deflector vanes (top). Economiser outlet to A/H inlet: • Replace 6mm-10mm thick eroded plate by welding new; • Replace 10mm-16mm thick eroded plate by welding new; • To fit 196 50mm socket and plugs; • Deflector plate 1200 x 2500mm; • Repair 25 x 10mm Dividing walls protection; • Replace round bar on ducting access ladders; • Remove and replace 16mm, 25mm round stainless steel thermocouples pockets with protection; • Replace 80 x 6mm seals on the flue gas damper; • Replace 35mm square bar sealing strips on the flue gas dampers; • Fit new packing; • Cut and replace 60 x 6mm wide expansion joint sections; • Attach chains and damps to hanger rods; • Replace cell inlet damper stainless steel seals; • Replace cell inlet damper 40 x 40 x 6mm angle iron; • Replace 120 x 75mm round shaft on the flue gas damper. (EN) Zu Favoriten hinzufügen
Kunde: ONLINE TENDERS

Nummer: 104488295

Land: South Africa

Quelle: ONLINE TENDERS